Ale dirèk nan kontni prensipal la

Schedule shifts

It is Friday and Tom is writing next week's rota for Claymont. This page is how to create, confirm, edit and cancel shifts, and which single action on the scheduling page replaces it with an error.

Choosing a site on this page replaces it with an error

Shift Scheduling opens with no site chosen and looks fine. Choose one from the list at the top and the whole page becomes "Something went wrong", calendar, float pool and all. Try Again fails the same way. The reason is under Choosing a site breaks the page. Until it is fixed, manage shifts from the staff member's own Schedule tab, which works, and only use the scheduling page to create a shift, pressing Create Shift before you touch the site list.

What you need

Decide the shift type. It is required, and the dialog offers the types PTRS accepts.

A person cannot hold two overlapping shifts on the same date, at any site. PTRS ignores the site when it checks, which is right, because one person at two sites at once is still one person in two places. Shifts that merely touch are allowed: one ending at 12:00 and the next starting at 12:00 do not overlap.

Create a shift

  1. Open Staff, then Shift Scheduling, subtitled "Manage staff schedules, identify coverage gaps, and coordinate float pool assignments."

  2. Press Create Shift before touching the site list at the top of the page. The dialog has its own site field.

  3. In the dialog, set:

    FieldRequiredNote
    Staff memberYesSearched from up to 500 active staff
    LocationYesPTRS does not check that it is a real site
    RoomNoPTRS does not check that it is a real room, or that it belongs to the site
    DateYes
    Start time and End timeYesThe end must be after the start. A shift cannot cross midnight.
    Shift typeYes
    NotesNoAny length
    Recurring and weeksNo1 to 52. Repeats weekly on the same weekday.
  4. Submit. A message reads "Shift created".

Manage a shift from the staff member's record

Open the staff member, then the Schedule tab. It lists Upcoming Shifts, or "No shifts scheduled". This tab cannot create a shift, and it can confirm and cancel one, which makes it the safe place to work while the scheduling page is unusable. View Full Schedule takes you to the scheduling page.

Confirm, edit and cancel

  • Confirm: press the confirm control on the shift. A message reads "Shift confirmed". Confirming twice is refused.
  • Edit: changes the room, date, times, type and notes. Editing also clears the confirmation, even if you only changed the notes.
  • Cancel: the shift is hidden, not erased. A message reads "Shift cancelled". It cannot be undone from any screen.

A shift cannot be moved to a different person or a different site. Both are fixed when it is created. Cancel it and create a new one.

The calendar has Week and Month views, with weeks starting on Sunday.

What PTRS records

The shift is on the calendar and in the staff member's Schedule tab, and the audit trail carries an entry.

Creating or editing a shift for today also makes PTRS re-work that site's ratio and tell any open screens about it. No screen in PTRS listens for that message. See What happens automatically.

What this page does not do

Choosing a site breaks the page

When PTRS refuses

What you seeWhat it meansWhat to do
Something went wrong, after choosing a siteThe coverage-gap panel aboveWork from the staff member's Schedule tab
Staff member '…' already has an overlapping shift on (date).Double-booked, possibly at another siteCheck the other site before rescheduling
Shift end time must be after start time.The end is at or before the start, or the shift crosses midnightSplit an overnight shift into two
Shift '…' is already confirmed.Confirmed twice, or in two tabsReload
Shift with ID '…' was not found.Cancelled elsewhere, or another organisation'sReload
A repeating series was not created and nothing appearedOne date clashed and the whole request stoppedThe message names the date. Clear that clash, or shorten the series.
Failed to load scheduling dataThe calendar could not load. The page shows the reason.A site with no shifts is not an error. This is a failed request. Reload.

Checked against PTRS on 7 September 2026.